Size:
φ6、φ8、φ10、1/4”、3/8”、1/2”、3/4”、1”、1-1/4”、1-1/2”
Method of operation:
Tools needed to be prepared:
1. Hot wind gun
2. Nut
3. Fitting
4. Tube
5. Flaring Tool
Operating steps:
1. Put the nut into the tube
2. Use the hot air gun to heat the tube. During the heating process, rotate the tube at a uniform speed to ensure that the pipe is heated evenly
3.Place the expander into the tube as soon as possible until the tube is cooled
4. Insert the flared tube into the joint and tighten the nut
5. Complete the connection
Application industry:
Chemical industry, pharmaceutical, photovoltaic, semiconductor, electroplating, water treatment and other industries
E-mail:XU@hlkncse.com